HINTS FOR ORDERING AFTER DESIGNING DUCTING SYSTEM
|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
FOR THE Q.A. INSTALLATION GUIDE - PLEASE CLICK HERE
HINTS FOR ORDERING AFTER DESIGNING DUCTING SYSTEM COLLAPSIBILITY STRENGTH OF SPEEDY DUCTING DUCTWORK LEAKAGE IN SPEEDY DUCTING DUCTWORK SYSTEM LEAKAGE RATE FOR SPEEDY DUCTING SYSTEM IN CFM PER Q.A. JOINT PAINTING GALVANISED COMPONENTS SEALANT USED ON SEAMS OF COMPONENTS SPEEDY DUCTING SYSTEM DUCT SPECIFICATIONS VELOCITY REQUIREMENTS FOR TYPICAL MATERIALS RULE OF THUMB SPEEDY DUCTING INSTALLATION LABOUR GUIDELINE
1. Order one clamp per Speedy Ducting Product.
2. Specify dimensional information to speed up process:
3. Specify end configuration required:
4. Look for 60 degree bends to compliment 30 degree branch orders.
5. Specify your needs (i.e. flange styles, hole patterns). Typical parts requiring flanges will be parts that connect to filters and fans.
TEC-ALLOY, Aluminium metal coating # 1950 COLLAPSIBILITY STRENGTH OF SPEEDY DUCTING DUCTWORK
Each size of piping has been tested for strength against collapsing. The piping was exposed to constant positive pressure and constant vaccum. Each duct was exposed to a maximum capacity of the test equipment of 40" WG of vacuum and positive pressure. None of the pipe showed any form of deformation during the test. Duct & fittings must be installed in accordance with ASM's standard specifications and normal good workmanship practices.
LEAKAGE IN SPEEDY DUCTING SYSTEM
All fit together ducting systems allow for some degree of leakage. "Q.A" ducting is no exception and is not sold as an airtight ducting system. In addition to standard PVC foam gasket, Speedy Ducting offers special clamp gasket material for high heat and enhancing sealing. Further, the applying of sealants to the individual rolled ends can enhance the tightness of the system. However, the " Q.A" system is sold as a quick way of installing and modifying duct-work while at the same time retaining the usability of each component. In short, "Q.A" is meant to be able to taken apart, re-assembled, stored or moved. Completely eliminating the possibility for leakage jeopardises the inherent benefits of the Speedy Ducting system. Standard "Q.A" is designed to provide tight sealing and efficient air flow under negative pressures. To that end we are providing the following information for piping situations where fan sizing is extreme importance.
The following data was obtained using standard components from the Speedy Ducting system and was performed in accordance with the "HVAC AIR DUCT LEAKING TEST MANUAL". The information gives the leakage rate per joint of duct at various pressures. To utilise the chart, count the number of clamps (This equals the number of pieces) per rise and multiply by the number given beside the corresponding diameter and under the applicable pressure. These numbers assume that the product is product is properly installed; free of dents in the joining ends and the gasket is in place. Special gasket material and sealants will increase the sealing capabilities of the Speedy Ducting system.
LEAKAGE RATE FOR SPEEDY DUCTING SYSTEM IN CFM PER Q.A. JOINT
1. Wash down all components with an industrial de-greaser ensuring that no oils or residues are left behind.
SEALANT USED ON SEAMS OF COMPONENTS
Scotch Seal 2084 metal sealant, 3m ID # 62-2084-2631-2. Ingredients: acetone, acrylonitrile, kaolin, phenolic resin, rosin ester salicylic acid, aluminium pigment zinc oxide, amorphous silica
SPEEDY DUCTING SYSTEM DUCT SPECIFICATIONS
COMPONENT MATERIAL
1.Components constructed of galvanised steel sheets produced by the continuous galvanising process, which conforms to lock forming quality ASTM A-527, and commercial quality ASTM A-526. Galvanised sheeting is produced with the minimum of spangle.
2.Components constructed of stainless steel will be 304 2B mill finish as standard, or 316 2B mill finish if specified.
ROLLED EDGE DUCTING - Material sheet blanks are 2000mm long and rolled with a longitudinal seam. The ends of the duct are then formed at each end, thus producing a rolled edge on both ends of the duct, and creating reinforcement every 2000mm.
FLANGED DUCTING - Material sheet blanks are 2000mm long and rolled with a longitudinal seam. A flat bar flange is placed on the end of each duct, and is allowed to spin, thus making it easier to line up holes when installing. All rolled duct joints are secured by using a clip. Locking pins are installed to ensure that clips can not be accidentally released once installed.
VELOCITY REQUIREMENTS FOR TYPICAL MATERIALS
RULE OF THUMB LABOUR GUIDELINEThe following methods should be used for comparison and budgetary purposes only. By no means should they be used to confirm a job installation. A. Long straight runs and trunk-lines
B. Machine Connections
A + B = TOTAL MAN HOURS | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||